{"id":10406,"date":"2019-05-13T13:59:51","date_gmt":"2019-05-13T11:59:51","guid":{"rendered":"https:\/\/eng.hzinfra.hr\/?p=10406"},"modified":"2019-05-20T12:50:32","modified_gmt":"2019-05-20T10:50:32","slug":"preparation-of-study-documentation-for-the-modernization-of-the-railway-line-m104-novska-tovarnik-state-border-line-section-okucani-vinkovci","status":"publish","type":"post","link":"https:\/\/eng.hzinfra.hr\/?p=10406","title":{"rendered":"Preparation of study documentation for the modernization of the railway line M104 Novska \u2013 Tovarnik \u2013 state border, line section Oku\u010dani &#8211; Vinkovci"},"content":{"rendered":"<p>Contract Notice for the preparation of study documentation for the Project \u201cPreparation of design documentation for the reconstruction of the Oku\u010dani \u2013 Vinkovci railway section\u201d published on April 23, 2018 on Electronic Public Procurement Classifieds (EOJN).<\/p>\n<p>H\u017d Infrastruktura d.o.o. signed on May 17, 2019 service contract for the preparation of study documentation for the Project \u201cPreparation of design documentation for the reconstruction of the Oku\u010dani \u2013 Vinkovci railway section\u201d with GRANOVA d.o.o., \u017dPD d.d., INSTITUT IGH d.d., RIJEKAPROJEKT d.o.o. i IPZ d.d. from Croatia in the amount of HRK 10,700,000,00.<\/p>\n<p>Publication can be accessed <a href=\"https:\/\/eojn.nn.hr\/SPIN\/APPLICATION\/IPN\/DocumentManagement\/DokumentPodaciFrm.aspx?id=1642853\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contract Notice for the preparation of study documentation for the Project \u201cPreparation of design documentation for the reconstruction of the Oku\u010dani \u2013 Vinkovci railway section\u201d published on April 23, 2018 on Electronic Public Procurement Classifieds (EOJN). H\u017d Infrastruktura d.o.o. signed on May 17, 2019 service contract for the preparation of study documentation for the Project [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[58,33],"tags":[],"class_list":["post-10406","post","type-post","status-publish","format-standard","hentry","category-cef-ugovoreni-natjecaji","category-cef-connecting-europe-facility"],"_links":{"self":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/posts\/10406","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10406"}],"version-history":[{"count":0,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/posts\/10406\/revisions"}],"wp:attachment":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10406"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10406"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10406"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}