{"id":13687,"date":"2020-12-28T14:15:21","date_gmt":"2020-12-28T12:15:21","guid":{"rendered":"http:\/\/eng.hzinfra.hr\/?p=13687"},"modified":"2023-07-05T08:24:58","modified_gmt":"2023-07-05T06:24:58","slug":"improvement-of-railway-infrastructure-establishment-of-monitoring-systems-for-safety-security-and-technical-controls","status":"publish","type":"post","link":"https:\/\/eng.hzinfra.hr\/?p=13687","title":{"rendered":"Improvement of railway infrastructure &#8211; establishment of monitoring systems for safety, security and technical controls"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;section&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;][et_pb_row column_structure=&#8221;2_3,1_3&#8243; admin_label=&#8221;row&#8221; _builder_version=&#8221;4.16&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;2_3&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text admin_label=&#8221;Op\u0107i tekst EU mjerne postaje&#8221; _builder_version=&#8221;4.19.4&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; hover_enabled=&#8221;0&#8243; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221; global_colors_info=&#8221;{}&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<h1><span style=\"color: #30639b;\">Improvement of railway infrastructure &#8211; establishment of a monitoring system for safety, security and technical controls<\/span><\/h1>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-19859 size-medium alignleft\" src=\"https:\/\/eng.hzinfra.hr\/wp-content\/uploads\/2023\/07\/Poboljsanje-infrastrukture-ilustracija-27-06-2023-300x300.jpg\" alt=\"\" width=\"300\" height=\"300\" \/><\/p>\n<p>With this Project the investment continues in the modernization of the railway transport infrastructure in the Republic of Croatia with the aim of increasing safety and interoperability on the <strong>Croatian part of the Mediterranean Corridor and on the other part of the Core Network<\/strong>, and it will also contribute to the further development of the Trans-European transport network.<\/p>\n<p><strong>On 11 November 2020 H\u017d Infrastruktura d.o.o. signed<\/strong> <strong>the<\/strong> <strong>Grant Agreement<\/strong> INEA\/CEF\/TRAN\/M2019\/2097375 as part of the Connecting Europe Facility Transport Sector (CEF &#8211; Connecting Europe Facility) with the <strong>European Climate, Infrastructure and Environment Executive Agency<\/strong> (CINEA). <strong>The value of the<\/strong> <strong>Grant Agreement is EUR<\/strong> <strong>17.1 million<\/strong>, of which <strong>EUR<\/strong> <strong>14.5 million<\/strong> or <strong>85 percent<\/strong> is co-financed from the<strong> CEF<\/strong>, and the remaining amount of <strong>EUR 2.6 million<\/strong>, or <strong>15 percent,<\/strong> is co-financed from the State Budget of the Republic of Croatia.<\/p>\n<p>The signed Grant Agreement covers the following activities:<\/p>\n<ol>\n<li>Project management, publicity and visibility<\/li>\n<li>Procurement and installation of equipment for measuring stations &#8211; for type 1 measuring stations (5 locations)<\/li>\n<li>Procurement and installation of equipment for measuring stations &#8211; for type 2 measuring stations (4 locations)<\/li>\n<\/ol>\n<p>On 21 March 2023 H\u017d Infrastruktura signed a <strong>Works contract<\/strong> with consortium consisting of ELEKTROKEM d.o.o. and S&amp;T Iskratel d.o.o. in the amount of <strong>EUR 7.7 million<\/strong>.<\/p>\n<p>With the implementation of the works, equipment will be installed to ensure the technical control of railway vehicles in motion and the exchange of information on the Core Network (TEN-T) in the Republic of Croatia, as well as the introduction of an automated system for the supervision of railway vehicles as well as the automatic collection of data and technical parameters of trains, and the rail-train interaction in real-time rail at 9 locations.<\/p>\n<p>For more information about the Project please contact: <a href=\"mailto:korporativne.komunikacije@hzinfra.hr\">korporativne.komunikacije@hzinfra.hr<\/a>.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][et_pb_column type=&#8221;1_3&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_divider show_divider=&#8221;off&#8221; disabled_on=&#8221;on|on|off&#8221; admin_label=&#8221;Divider&#8221; _builder_version=&#8221;4.16&#8243; height=&#8221;3px&#8221; hide_on_mobile=&#8221;on&#8221; global_colors_info=&#8221;{}&#8221;] [\/et_pb_divider][et_pb_image src=&#8221;http:\/\/eng.hzinfra.hr\/wp-content\/uploads\/2018\/07\/en_horizontal_cef_logo_2.png&#8221; align=&#8221;center&#8221; align_tablet=&#8221;center&#8221; align_phone=&#8221;&#8221; align_last_edited=&#8221;on|desktop&#8221; admin_label=&#8221;Image CEF&#8221; _builder_version=&#8221;4.16&#8243; animation_style=&#8221;slide&#8221; animation_direction=&#8221;left&#8221; animation_duration=&#8221;500ms&#8221; animation_intensity_slide=&#8221;10%&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221; animation=&#8221;left&#8221; sticky=&#8221;off&#8221; always_center_on_mobile=&#8221;on&#8221; locked=&#8221;off&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<p>[\/et_pb_image][et_pb_divider show_divider=&#8221;off&#8221; disabled_on=&#8221;on|on|off&#8221; admin_label=&#8221;Divider&#8221; _builder_version=&#8221;4.16&#8243; height=&#8221;3px&#8221; hide_on_mobile=&#8221;on&#8221; global_colors_info=&#8221;{}&#8221;] [\/et_pb_divider][et_pb_image src=&#8221;https:\/\/eng.hzinfra.hr\/wp-content\/uploads\/2017\/11\/theme_cef_0.png&#8221; align=&#8221;center&#8221; align_tablet=&#8221;center&#8221; align_phone=&#8221;&#8221; align_last_edited=&#8221;on|desktop&#8221; admin_label=&#8221;Image CEF&#8221; _builder_version=&#8221;4.16&#8243; animation_style=&#8221;slide&#8221; animation_direction=&#8221;left&#8221; animation_duration=&#8221;500ms&#8221; animation_intensity_slide=&#8221;10%&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221; animation=&#8221;left&#8221; sticky=&#8221;off&#8221; always_center_on_mobile=&#8221;on&#8221; locked=&#8221;off&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<p>[\/et_pb_image][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Improvement of railway infrastructure &#8211; establishment of a monitoring system for safety, security and technical controls &nbsp; With this Project the investment continues in the modernization of the railway transport infrastructure in the Republic of Croatia with the aim of increasing safety and interoperability on the Croatian part of the Mediterranean Corridor and on the [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[33,4],"tags":[],"class_list":["post-13687","post","type-post","status-publish","format-standard","hentry","category-cef-connecting-europe-facility","category-eu"],"_links":{"self":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/posts\/13687","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13687"}],"version-history":[{"count":0,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/posts\/13687\/revisions"}],"wp:attachment":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13687"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13687"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13687"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}