{"id":7605,"date":"2017-01-09T13:04:34","date_gmt":"2017-01-09T11:04:34","guid":{"rendered":"https:\/\/eng.hzinfra.hr\/?p=7605"},"modified":"2026-11-11T14:18:45","modified_gmt":"2026-11-11T13:18:45","slug":"reconstruction-of-the-existing-track-and-construction-of-the-second-track-on-the-section-krizevci-koprivnica-state-border","status":"publish","type":"post","link":"https:\/\/eng.hzinfra.hr\/?p=7605","title":{"rendered":"Reconstruction of the existing track and construction of the second track on the section Kri\u017eevci-Koprivnica-state border"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;section&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;][et_pb_row column_structure=&#8221;3_4,1_4&#8243; admin_label=&#8221;row&#8221; _builder_version=&#8221;4.16&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;3_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text admin_label=&#8221;Text&#8221; _builder_version=&#8221;4.19.4&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h1><span style=\"color: #30639b;\">Reconstruction of the existing track and construction of the second track on the section Kri\u017eevci &#8211; Koprivnica &#8211; state border<\/span><\/h1>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-19855 size-full alignleft\" src=\"https:\/\/eng.hzinfra.hr\/wp-content\/uploads\/2023\/07\/Kz-Kc-karta-27-06-2023.png\" alt=\"\" width=\"251\" height=\"248\" \/>Section <strong>Kri\u017eevci &#8211; Koprivnica &#8211; state border <\/strong>(42.6 km) is an integral part of the main railway corridor for international traffic <strong>M201 State border &#8211; Botovo &#8211; Dugo Selo <\/strong>on the<strong> corridor RH2<\/strong> and is also part of the section <strong>Rijeka &#8211; Zagreb &#8211; Budapest <\/strong>on the<strong> Mediterranean corridor<\/strong>.<\/p>\n<p>H\u017d Infrastruktura d.o.o. in this way continues with the modernization of the Mediterranean Corridor, which connects the Iberian Peninsula with the Hungarian-Ukrainian border via the Port of Rijeka, Zagreb and Budapest, and thus with the single Trans-European Transport Network (TEN-T). The project is part of the continuation of the development of the railway network and the establishment of a high-efficiency double-track railway line for combined transport from the Hungarian border to the Port of Rijeka.<\/p>\n<p><strong>On 6 October 2016 H\u017d Infrastruktura d.o.o. signed the Grant Agreement<\/strong> INEA\/CEF\/TRAN\/M2015\/1126931 as part of the Instrument for Connecting Europe Transport Sector (CEF &#8211; Connecting Europe Facility) with the <strong>European Climate, Infrastructure and Environment Executive Agency <\/strong>(CINEA)<strong>. The value of the Grant Agreement is EUR 283.9 million<\/strong>, of which <strong>EUR 241.3 million<\/strong> or <strong>85 percent<\/strong> is co-financed from the <strong>CEF<\/strong>, and the remaining amount of <strong>EUR 42.6 million<\/strong> or <strong>15 percent<\/strong>, is co-financed from the State Budget of the Republic of Croatia.<\/p>\n<p>The signed Grant Agreement covers the following activities:<\/p>\n<ol>\n<li>Project management, publicity and visibility<\/li>\n<li>Land acquisition<\/li>\n<li>Works<\/li>\n<li>Supervision<\/li>\n<\/ol>\n<p>On 12 March 2020 H\u017d Infrastruktura signed <strong>Works contract<\/strong> with the company Cengiz Insaat Sanayi ve Ticaret A.S. in the amount of <strong>EUR<\/strong> <strong>320.9 million<\/strong>.<\/p>\n<p>On 23 March 2020 H\u017d Infrastruktura d.o.o. signed <strong>Service contract for supervision of works <\/strong>with a consortium consisting of Centar za organizaciju gra\u0111enja d.o.o. and DB Engineering &amp; Consulting GmbH in the amount of <strong>EUR 5.3 million.<\/strong><\/p>\n<p>The project includes works on the construction of the second track and the reconstruction of the existing track from Kri\u017eevci to the Hungarian border. It will be possible to reach train speeds of up to 160 km\/h, with a limit of 150 km\/h in Lepavina and 100 km\/h in Koprivnica, since this part consists of urban areas with specific restrictions. The new double-track section will follow the existing route with the exception of the subsection Carevdar &#8211; Lepavina. By constructing new platforms, canopies, pedestrian underpasses and parking lots for cars and bicycles the Project will help facilitate easier access for reduced mobility persons. The total length of the section Kri\u017eevci &#8211; Koprivnica &#8211; state border with Hungary will be reduced from 43.2 km to 42.6 km.<\/p>\n<p>As part of the Project, the following works are planned:<\/p>\n<ul>\n<li>reconstruction of 2 stations: Lepavina and Koprivnica<\/li>\n<li>construction of the new station Novo Drnje<\/li>\n<li>reconstruction of 4 stops: Majurec, Carevdar, Vojakova\u010dki Klo\u0161tar and Sokolovac<\/li>\n<li>construction of the new stop Peteranec and conversion of the existing station Mu\u010dna Reka into a stop<\/li>\n<li>construction of 7 bridges, 1 gallery and 3 viaducts, of which 1 is a crossing for wild animals<\/li>\n<li>construction of 8 road overpasses, 3 road underpasses and 9 pedestrian underpasses<\/li>\n<li>construction of redirecting roans and parallel roads along the railway line<\/li>\n<li>works on the construction and reconstruction of the overhead contact line and other power plants such as electric traction plants, power plants and external lighting in bus stops and stations<\/li>\n<li>works on the installation of new elements and devices on the signalling and interlocking, control-command and telecommunications system.<\/li>\n<\/ul>\n<p>For more information about the project please contact <a href=\"mailto:korporativne.komunikacije@hzinfra.hr\">korporativne.komunikacije@hzinfra.hr<\/a>.<\/p>\n<p>[\/et_pb_text][et_pb_divider show_divider=&#8221;off&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;][\/et_pb_divider][et_pb_text admin_label=&#8221;Text Visualizations of the objects and track Kri\u017eevci &#8211; Koprivnica &#8211; State border&#8221; _builder_version=&#8221;4.16&#8243; custom_margin=&#8221;33px|||||&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h6>Visualizations of the objects and track Kri\u017eevci &#8211; Koprivnica &#8211; State border<\/h6>\n<p>[\/et_pb_text][et_pb_gallery gallery_ids=&#8221;16334,16333,16332,16331,16330,16329,16328,16327,16326,16325,16324,16323,16322,16321,16320,16319,16318,16317,16316&#8243; posts_number=&#8221;3&#8243; admin_label=&#8221;Gallery Visualizations of the objects and track Kri\u017eevci &#8211; Koprivnica &#8211; State border&#8221; _builder_version=&#8221;4.16&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_gallery][et_pb_text admin_label=&#8221;Text Works&#8221; _builder_version=&#8221;4.16&#8243; custom_margin=&#8221;33px|||||&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h6>Works<\/h6>\n<p>[\/et_pb_text][et_pb_gallery gallery_ids=&#8221;29891,29890,29894,29888,29893,29895,29897,29889,29898,29899,29896,29892,27593,27592,27591,27590,27589,26439,26440,26438,25738,25739,25740,25741,25742,25743,25744,25745,25746,25747,25748,25749,25750,25751,25752,25753,25524,25525,25523,25522,25521,25526,25520,25519,25518,25517,25516,25527,25528,25529,25515,25514,25513,25201,25200,25199,25198,25196,25197,25195,25194,25193,25192,25191,25190,25189,25188,25187,24884,24883,24882,24881,24880,24879,24878,24877,24876,24875,24874,24873,24521,24520,24519,24518,24517,24516,24515,24514,24513,24512,24511,24510,24509,24508,24295,24296,24306,24305,24304,24302,24301,24307,24300,24299,24298,24297,24308,24309,24310,24311,24312,24313,24315,24316,23810,23809,23808,23807,23806,23805,23804,23464,23463,23462,23461,23460,23459,23458,23456,23455,23454,23453,23452,23451,23450,23449,23448,23447,23543,23552,23551,23550,23549,23548,23547,23546,23545,23544,22756,22755,22754,22753,22752,22751,22750,22749,22748,22747,22746,22745,22744,22742,22741,22740,22722,22721,22720,22719,22718,22743,22717,22716,22715,22714,22713,22712,22711,22710,22709,22708,22707,22706,22705,22375,22374,22373,22372,22371,22370,22369,22368,22367,22366,22365,22364,22363,22362,22361,22360,22359,22358,22357,22036,22037,21996,21995,21994,21993,21992,21991,21990,21989,21988,21987,21841,21840,21838,21839,21837,21836,21835,21834,21833,21832,21831,21830,21829,21828,21827,21826,21576,21575,21574,21573,21568,21572,21571,21570,21569,20973,20971,20972,20578,20577,20576,20575,20574,20573,20571,20570,20569,20579,18764,18763,18762,18761,18760,18759,18758,18757,18756,18755,18754,18753,18752,18751,18750,18679,18678,18677,18676,18675,18674,18673,18672,18671,18670,18669,18213,18212,18211,18210,18209,18208,18207,18206,18205,18204,18203,18202,18201,18200,18199,18198,18197,18196,18195,18194,18193,18192,17983,17978,17984,17982,17981,17980,17979,17623,17622,17621,17620,17619,17354,17351,17352,17353,16983,16981,16982,16769,16768,16767,16766,16765,16764,16763,16762,16761,16760,16759,16758,16757,16756,16755,16754,16753,16752,16751,16750,16384,16383,16381,16380,16379,16378,16382,16377,16376,16375,16374,16373,16372,16371,16370,16369,16368,16367,16366,16365,16152,16151,16150,16149,16148,16147,16146,16145,16144,16143,16142,16141,16140,16139,16138,16137,16136,16135,16134,16133,16132,20572,16131&#8243; posts_number=&#8221;3&#8243; admin_label=&#8221;Gallery Works&#8221; _builder_version=&#8221;4.27.9&#8243; _module_preset=&#8221;default&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; sticky_enabled=&#8221;0&#8243;][\/et_pb_gallery][et_pb_text admin_label=&#8221;Text Aerial footage of works on the Kri\u017eevci &#8211; Koprivnica &#8211; state border section, July 2025.&#8221; _builder_version=&#8221;4.27.2&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h6>VIDEO Aerial footage of works on the Kri\u017eevci &#8211; Koprivnica &#8211; state border section, July 2025.<\/h6>\n<p>[\/et_pb_text][et_pb_video src=&#8221;https:\/\/www.youtube.com\/watch?v=NHTvwTS-_5g&#8221; admin_label=&#8221;Video Aerial footage of works on the Kri\u017eevci &#8211; Koprivnica &#8211; state border section, July 2025.&#8221; _builder_version=&#8221;4.27.2&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_video][et_pb_text admin_label=&#8221;Text Newly built part of the track from Vojakova\u010dki Klo\u0161tar to Mu\u010dna Reka&#8221; _builder_version=&#8221;4.27.2&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h6>VIDEO Newly built part of the track from Vojakova\u010dki Klo\u0161tar to Mu\u010dna Reka<\/h6>\n<p>[\/et_pb_text][et_pb_video src=&#8221;https:\/\/www.youtube.com\/watch?v=_dstGQPYQWo&#8221; admin_label=&#8221;Video Newly built part of the track from Vojakova\u010dki Klo\u0161tar to Mu\u010dna Reka&#8221; _builder_version=&#8221;4.27.2&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_video][et_pb_text admin_label=&#8221;Text Aerial footage of the Carevdar and Komari viaducts and Lepavina tunnels and station, november 2024.&#8221; _builder_version=&#8221;4.27.2&#8243; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h6>VIDEO Aerial footage of the Carevdar and Komari viaducts and Lepavina tunnels and station, november 2024.<\/h6>\n<p>[\/et_pb_text][et_pb_video src=&#8221;https:\/\/www.youtube.com\/watch?v=1DkALtUPsW8&#8243; admin_label=&#8221;Video Aerial footage of the Carevdar and Komari viaducts and Lepavina tunnels and station, november 2024.&#8221; _builder_version=&#8221;4.27.2&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_video][et_pb_text admin_label=&#8221;Text VIDEO Incremental launching of a new railway bridge on the Drava river near Botovo &#8211; time lapse\/drone&#8221; _builder_version=&#8221;4.23&#8243; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h6>VIDEO Incremental launching of a new railway bridge on the Drava river near Botovo &#8211; time lapse\/drone<\/h6>\n<p>[\/et_pb_text][et_pb_video src=&#8221;https:\/\/www.youtube.com\/watch?v=eGMwJ5DdBW8&#038;t=122s&#8221; admin_label=&#8221;Video Incremental launching of a new railway bridge on the Drava river near Botovo &#8211; time lapse\/drone&#8221; _builder_version=&#8221;4.23&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_video][et_pb_divider show_divider=&#8221;off&#8221; _builder_version=&#8221;4.16&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_divider][et_pb_text admin_label=&#8221;Text VIDEO Drone footage of the track, April 2023&#8243; _builder_version=&#8221;4.23&#8243; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h6>VIDEO Drone footage of the track, April 2023<\/h6>\n<p>[\/et_pb_text][et_pb_video src=&#8221;https:\/\/www.youtube.com\/watch?v=1o9IOPoNGEc&#038;t=79s&#8221; admin_label=&#8221;Video Drone footage of the track&#8221; _builder_version=&#8221;4.23&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_video][et_pb_divider show_divider=&#8221;off&#8221; admin_label=&#8221;Divider&#8221; _builder_version=&#8221;4.16&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_divider][et_pb_text admin_label=&#8221;Text VIDEO Works on the Majurec stop&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h6>VIDEO Works on the Majurec stop, February, 2022<\/h6>\n<p>[\/et_pb_text][et_pb_video src=&#8221;https:\/\/eng.hzinfra.hr\/wp-content\/uploads\/2022\/04\/Video-2022-02-27-at-12.14.42-Majurec.mp4&#8243; admin_label=&#8221;Video Works on the Majurec stop&#8221; _builder_version=&#8221;4.16&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_video][et_pb_divider show_divider=&#8221;off&#8221; _builder_version=&#8221;4.16&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_divider][et_pb_text admin_label=&#8221;Text VIDEO Works on the Kri\u017eevci overpass&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h6>VIDEO Works on the Kri\u017eevci overpass<\/h6>\n<p>[\/et_pb_text][et_pb_video src=&#8221;https:\/\/eng.hzinfra.hr\/wp-content\/uploads\/2017\/01\/Kz-Kc-Dg-Vid-20210727-Wa0010-1-1.m4v&#8221; admin_label=&#8221;Video Works on the Kri\u017eevci overpass&#8221; _builder_version=&#8221;4.16&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_video][et_pb_divider show_divider=&#8221;off&#8221; _builder_version=&#8221;4.16&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_divider][et_pb_text admin_label=&#8221;Text VIDEO Works on the Vuk overpass&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h6>VIDEO Works on the Vuk overpass<\/h6>\n<p>[\/et_pb_text][et_pb_video src=&#8221;https:\/\/eng.hzinfra.hr\/wp-content\/uploads\/2021\/07\/KZ-KC-DG-VID-20210727-WA0009.mp4&#8243; admin_label=&#8221;Video Works on the Vuk overpass&#8221; _builder_version=&#8221;4.16&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_video][et_pb_text _builder_version=&#8221;4.16&#8243; custom_margin=&#8221;33px|||||&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h6>The Ceremony of Contract Signing<\/h6>\n<p>[\/et_pb_text][et_pb_gallery gallery_ids=&#8221;12070,12071&#8243; admin_label=&#8221;Gallery potpisivanje ugovora&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;][\/et_pb_gallery][\/et_pb_column][et_pb_column type=&#8221;1_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_divider show_divider=&#8221;off&#8221; disabled_on=&#8221;on|on|off&#8221; admin_label=&#8221;Divider&#8221; _builder_version=&#8221;4.16&#8243; height=&#8221;60px&#8221; hide_on_mobile=&#8221;on&#8221; global_colors_info=&#8221;{}&#8221;] [\/et_pb_divider][et_pb_image src=&#8221;https:\/\/eng.hzinfra.hr\/wp-content\/uploads\/2018\/07\/en_horizontal_cef_logo_2.png&#8221; align=&#8221;center&#8221; align_tablet=&#8221;center&#8221; align_phone=&#8221;&#8221; align_last_edited=&#8221;on|desktop&#8221; admin_label=&#8221;Image&#8221; _builder_version=&#8221;4.16&#8243; animation_style=&#8221;slide&#8221; animation_direction=&#8221;left&#8221; animation_duration=&#8221;500ms&#8221; animation_intensity_slide=&#8221;10%&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221; animation=&#8221;left&#8221; sticky=&#8221;off&#8221; always_center_on_mobile=&#8221;on&#8221; global_colors_info=&#8221;{}&#8221;] [\/et_pb_image][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Reconstruction of the existing track and construction of the second track on the section Kri\u017eevci &#8211; Koprivnica &#8211; state border &nbsp; Section Kri\u017eevci &#8211; Koprivnica &#8211; state border (42.6 km) is an integral part of the main railway corridor for international traffic M201 State border &#8211; Botovo &#8211; Dugo Selo on the corridor RH2 and [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[33,4,25],"tags":[],"class_list":["post-7605","post","type-post","status-publish","format-standard","hentry","category-cef-connecting-europe-facility","category-eu","category-projekti-u-provedbi"],"_links":{"self":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/posts\/7605","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7605"}],"version-history":[{"count":2,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/posts\/7605\/revisions"}],"predecessor-version":[{"id":29901,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/posts\/7605\/revisions\/29901"}],"wp:attachment":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7605"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7605"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7605"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}