{"id":7631,"date":"2017-01-17T12:49:18","date_gmt":"2017-01-17T10:49:18","guid":{"rendered":"https:\/\/eng.hzinfra.hr\/?p=7631"},"modified":"2026-08-28T14:33:03","modified_gmt":"2026-08-28T12:33:03","slug":"upgrade-of-the-rijeka-port-infrastructure-zagreb-pier-container-terminal-por2core-zct","status":"publish","type":"post","link":"https:\/\/eng.hzinfra.hr\/?p=7631","title":{"rendered":"Upgrade of the Rijeka Port infrastructure \u2013 Zagreb Pier container terminal (POR2CORE-ZCT)"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;section&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;][et_pb_row column_structure=&#8221;3_4,1_4&#8243; admin_label=&#8221;row&#8221; _builder_version=&#8221;4.16&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;3_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text admin_label=&#8221;Op\u0107i tekst Zagreba\u010dka obala&#8221; _builder_version=&#8221;4.27.7&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; hover_enabled=&#8221;0&#8243; use_border_color=&#8221;off&#8221; global_colors_info=&#8221;{}&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<h1><span style=\"color: #30639b;\">Upgrade of the Rijeka Port infrastructure \u2013 Zagreb Pier container terminal (POR2CORE-ZCT)<\/span><\/h1>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-18720 alignleft\" src=\"https:\/\/www.hzinfra.hr\/wp-content\/uploads\/2016\/12\/Zagrebacko-pristaniste-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" \/>The\u00a0Project \u201cUpgrade of the Rijeka Port infrastructure \u2013 Zagreb Pier container terminal (POR2CORE-ZCT)\u201d <strong>is a joint project of the Port of Rijeka Authority and H\u017d Infrastruktura<\/strong>. The Project aims to contribute to the growth of the Port of Rijeka as one of <em>core<\/em> ports on the Mediterranean Corridor through ensuring the efficiency, sustainability and multimodality of the freight transport. A specific goal is <strong>to eliminate the existing bottleneck<\/strong> and to adapt the Rijeka station railway infrastructure to meet the increase in transport demand in the Port of Rijeka.<\/p>\n<p style=\"text-align: justify;\">The Project was applied for the second call of <strong>the Connecting Europe Facility \u2013 CEF,<\/strong> Transport 2015, Cohesion Envelope. The Grant Agreement &#8211; No. INEA\/CEF\/TRAN\/M2015\/1138367 was signed on November 18, 2016, between the Innovation and Networks Executive Agency (INEA) and the Port of Rijeka Authority, providing 85% co-financing from the European resources. <strong>The total value of the Project <\/strong>is<strong> \u20ac 31.6 million, <\/strong>and the H\u017dI share amounts to <strong>\u20ac<\/strong> <strong>22 million. <\/strong>The Project will be implemented from 2017 to 2020.<\/p>\n<p style=\"text-align: justify;\">The reconstruction of the cargo section of the Rijeka railway station and the construction of a terminal for intermodal railway transport on the Zagreb Pier container terminal are planned to be carried out <strong>in three stages<\/strong>:<\/p>\n<ol>\n<li style=\"text-align: justify;\">The reconstruction of the cargo section of the Rijeka railway station covers the reconstruction and extension of 12 tracks and turnout tracks, construction of cable ducts, and installation of telecommunication cables, feeding and lighting cables, as well as works on the catenary and the substructure in order to improve bearing capacity and drainage of the base (H\u017d Infrastruktura is the investor).<\/li>\n<li style=\"text-align: justify;\">Construction of a connection to track facilities and construction of cable ducts at the connection between the reconstructed tracks of Rijeka freight station and terminal to the existing condition (the Port of Rijeka Authority is the investor).<\/li>\n<li style=\"text-align: justify;\">Construction of four 400 m long tracks on the new part of Zagreb Pier container terminal, and two tracks for gantry cranes (the Port of Rijeka Authority is the investor).<\/li>\n<\/ol>\n<p>The service contract for <strong>supervision of works<\/strong> for the Project in the amount of <strong>HRK 3,191,427.68<\/strong> was signed by H\u017d Infrastruktura and the Port of Rijeka Authority on April 15, 2019, with consortium INSTITUT IGH d.d. and INVESTIN\u017dENJERING d.o.o. from Croatia.<\/p>\n<p>The contract for <strong>works<\/strong> for the Project in the amount of <strong>HRK 159,522,368.41<\/strong> was signed by H\u017d Infrastruktura and the Port of Rijeka Authority on July 4, 2019, with S\u017d-\u017dELEZNI\u010cKO GRADBENO PODJETJE LJUBLJANA d.d. from Slovenia.<\/p>\n<p>Works on the construction site began on October 9, 2019. <strong>In the freight section of the Rijeka railway station<\/strong> (investor H\u017d Infrastruktura), <strong>works were fully completed<\/strong> in October 2021, and all the works on the construction site were completed in September 2022. All certificates of occupancy were issued by October 2022.<\/p>\n<p>Upon completion of works and placing the new parts of the terminal into operation, the freight station increased its loading and unloading capacity by rail to 360,000 TEUs annually, which is about 60 percent of the total planned 600,000 TEUs.<\/p>\n<p>Link to the Port of Authority Rijeka: <a href=\"https:\/\/www.portauthority.hr\/en\/\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.portauthority.hr\/en\/<\/a>.<\/p>\n<p>For further information, please contact: <a href=\"mailto:korporativne.komunikacije@hzinfra.hr\">korporativne.komunikacije@hzinfra.hr<\/a><\/p>\n<p>[\/et_pb_text][et_pb_divider show_divider=&#8221;off&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;][\/et_pb_divider][et_pb_text _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h5>Works<\/h5>\n<p>[\/et_pb_text][et_pb_gallery gallery_ids=&#8221;16094,16095,16096,16037,16040,16038,16039,15332,15321,15322,15320,15323,13546,13545,13544,13543,13542,13541,13540,12919,12917,12918,12666,12664,12663,12665,11647,11646,11645,11644,11643,11144,11143,11142,11141&#8243; posts_number=&#8221;3&#8243; show_title_and_caption=&#8221;off&#8221; _builder_version=&#8221;4.16&#8243; min_height=&#8221;489px&#8221; custom_margin=&#8221;||-3px|||&#8221; custom_padding=&#8221;||0px|||&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_gallery][\/et_pb_column][et_pb_column type=&#8221;1_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_divider show_divider=&#8221;off&#8221; disabled_on=&#8221;on|on|off&#8221; _builder_version=&#8221;4.16&#8243; height=&#8221;60px&#8221; hide_on_mobile=&#8221;on&#8221; global_colors_info=&#8221;{}&#8221;]<br \/>\n[\/et_pb_divider][et_pb_image src=&#8221;https:\/\/eng.hzinfra.hr\/wp-content\/uploads\/2018\/07\/en_horizontal_cef_logo_2.png&#8221; align=&#8221;center&#8221; align_tablet=&#8221;center&#8221; align_phone=&#8221;&#8221; align_last_edited=&#8221;on|desktop&#8221; admin_label=&#8221;logo CEF&#8221; _builder_version=&#8221;4.16&#8243; animation_style=&#8221;slide&#8221; animation_direction=&#8221;left&#8221; animation_duration=&#8221;500ms&#8221; animation_intensity_slide=&#8221;10%&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221; animation=&#8221;left&#8221; sticky=&#8221;off&#8221; always_center_on_mobile=&#8221;on&#8221; global_colors_info=&#8221;{}&#8221;]<br \/>\n[\/et_pb_image][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Upgrade of the Rijeka Port infrastructure \u2013 Zagreb Pier container terminal (POR2CORE-ZCT) &nbsp; The\u00a0Project \u201cUpgrade of the Rijeka Port infrastructure \u2013 Zagreb Pier container terminal (POR2CORE-ZCT)\u201d is a joint project of the Port of Rijeka Authority and H\u017d Infrastruktura. The Project aims to contribute to the growth of the Port of Rijeka as one of [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[33,4],"tags":[],"class_list":["post-7631","post","type-post","status-publish","format-standard","hentry","category-cef-connecting-europe-facility","category-eu"],"_links":{"self":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/posts\/7631","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7631"}],"version-history":[{"count":1,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/posts\/7631\/revisions"}],"predecessor-version":[{"id":29248,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/posts\/7631\/revisions\/29248"}],"wp:attachment":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7631"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7631"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7631"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}