{"id":9154,"date":"2018-06-26T09:53:29","date_gmt":"2018-06-26T07:53:29","guid":{"rendered":"https:\/\/eng.hzinfra.hr\/?p=9154"},"modified":"2024-10-25T08:25:03","modified_gmt":"2024-10-25T06:25:03","slug":"upgrade-and-electrification-of-the-railway-line-vinkovci-vukovar","status":"publish","type":"post","link":"https:\/\/eng.hzinfra.hr\/?p=9154","title":{"rendered":"Upgrade and electrification of the railway line Vinkovci \u2013 Vukovar"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;section&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;][et_pb_row column_structure=&#8221;3_4,1_4&#8243; admin_label=&#8221;row&#8221; _builder_version=&#8221;4.16&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;3_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text _builder_version=&#8221;4.27.2&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; hover_enabled=&#8221;0&#8243; use_border_color=&#8221;off&#8221; global_colors_info=&#8221;{}&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<h1><span style=\"color: #30639b;\">Upgrade and electrification of line section Vinkovci &#8211; Vukovar<\/span><\/h1>\n<p><strong><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-19812 size-full alignleft\" src=\"https:\/\/eng.hzinfra.hr\/wp-content\/uploads\/2023\/07\/Vinkovci-Vukovar-karta-27-06-2023.png\" alt=\"\" width=\"246\" height=\"246\" srcset=\"https:\/\/eng.hzinfra.hr\/wp-content\/uploads\/2023\/07\/Vinkovci-Vukovar-karta-27-06-2023.png 246w, https:\/\/eng.hzinfra.hr\/wp-content\/uploads\/2023\/07\/Vinkovci-Vukovar-karta-27-06-2023-150x150.png 150w\" sizes=\"(max-width: 246px) 100vw, 246px\" \/><\/strong><\/p>\n<p><strong>Railway line Vinkovci &#8211; Vukovar<\/strong> (18.7 km) as a railway line for international traffic is part of the<strong> railway freight corridor RFC10 &#8220;Alps &#8211; Western Balkans&#8221;<\/strong>.<\/p>\n<p><strong>On 21 May 2018 H\u017d Infrastruktura d.o.o. signed the Grant Agreement<\/strong> KK.07.5.1.05.0001 as part of the Operational Program &#8220;Competitiveness and Cohesion&#8221; 2014 &#8211; 2020 (OPCC) from the Cohesion Fund with the <strong>Ministry of the Sea, Transport and Infrastructure <\/strong>(MSTI)<strong> and Central Finance and Contracting Agency <\/strong>(CFCA)<strong>. The value of the Grant Agreement is EUR 89.9 million, <\/strong>and <strong>the total eligible costs <\/strong>amount to<strong> EUR 68.5 million<\/strong>. The maximum amount for the co-financing of eligible costs of the Project is<strong> EUR 64.4 million<\/strong>, of which <strong>EUR 54.7 million<\/strong> or <strong>85 percent<\/strong> is co-financed from <strong>OPCC<\/strong> and the remaining amount of <strong>EUR 9.7 million<\/strong> or <strong>15 percent<\/strong> is co-financed from the State Budget of the Republic of Croatia.<\/p>\n<p>The Project implementation period according to the Grant Agreement is 03\/2016 &#8211; 12\/2024.<\/p>\n<p>The Grant Agreement covers the following activities:<\/p>\n<ol>\n<li>Project management<\/li>\n<li>Publicity and visibility<\/li>\n<li>Works<\/li>\n<li>Supervision<\/li>\n<li>Additional costs (contingencies)<\/li>\n<li>Land acquisition<\/li>\n<\/ol>\n<p>On 20 December 2019 H\u017d Infrastruktura signed <strong>Works contract<\/strong> with consortium consisting of COMSA S.A.U. and COMSA INSTALACIONES Y SISTEMAS INDUSTRIALES S.A.U. in the amount of <strong>EUR<\/strong> <strong>49.9 million.<\/strong><\/p>\n<p>On 14 March 2019 H\u017d Infrastruktura signed a <strong>Service contract for supervision of works<\/strong> with a consortium consisting of RUBICON ENGINEERING EAD and SPC ENGINEERING EOOD in the amount of <strong>EUR 1.7 million<\/strong>.<\/p>\n<p>Carrying out of works on the <strong>Vinkovci &#8211; Vukovar<\/strong> railway line will enable it for train speeds of a maximum of 120 km\/h, and journey time will be reduced. Electrification of the section ensures economically and energetically more profitable and ecologically sustainable railway transport. The capacity of the section is also increased and access to the port of Vukovar is improved, which contributes to the economic development of the local community and the recovery of the eastern part of Slavonia. Within the scope of works, parking lots for cars and bicycles have been arranged in stations and stops, which enables easier access for people with reduced mobility, and the construction of walls ensures noise protection for residents who live along the railway line. The safety of all traffic participants is increased by installing a modern traffic signalling and telecommunications system and the construction of pedestrian subways.<\/p>\n<p>The project includes:<\/p>\n<ul>\n<li>complete reconstruction and renovation of the existing single-track railway line<\/li>\n<li>renewal of Vukovar-Borovo Naselje and Vukovar railway stations and Nu\u0161tar and Br\u0161adin-Lipova\u010da stops<\/li>\n<li>works on the civil engineering, traffic and control, signalling and interlocking and power subsystem.<\/li>\n<\/ul>\n<p>Obtaining all necessary permits and approvals in order to put the modernized railway line into operation in accordance with all the parameters foreseen by the project is ongoing.<\/p>\n<p>For more information about the Project please contact <a href=\"mailto:korporativne.komunikacije@hzinfra.hr\">korporativne.komunikacije@hzinfra.hr<\/a>.<\/p>\n<p>[\/et_pb_text][et_pb_divider show_divider=&#8221;off&#8221; _builder_version=&#8221;4.19.4&#8243; _module_preset=&#8221;default&#8221; height=&#8221;30px&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_divider][et_pb_text admin_label=&#8221;Text gallery Works&#8221; _builder_version=&#8221;4.19.4&#8243; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h5>Works<\/h5>\n<p>[\/et_pb_text][et_pb_divider show_divider=&#8221;off&#8221; _builder_version=&#8221;4.19.4&#8243; _module_preset=&#8221;default&#8221; height=&#8221;10px&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_divider][et_pb_video src=&#8221;https:\/\/www.hzinfra.hr\/wp-content\/uploads\/2022\/03\/Comsa.m4v&#8221; admin_label=&#8221;Video radovi Comsa o\u017eujak 2022.&#8221; _builder_version=&#8221;4.16&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_video][et_pb_divider show_divider=&#8221;off&#8221; _builder_version=&#8221;4.19.4&#8243; _module_preset=&#8221;default&#8221; height=&#8221;50px&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_divider][et_pb_video src=&#8221;https:\/\/www.hzinfra.hr\/wp-content\/uploads\/2021\/09\/1234.m4v&#8221; image_src=&#8221;https:\/\/eng.hzinfra.hr\/wp-content\/uploads\/2021\/09\/DJI_0021.jpg&#8221; admin_label=&#8221;Video radovi&#8221; _builder_version=&#8221;4.16&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_video][et_pb_divider show_divider=&#8221;off&#8221; _builder_version=&#8221;4.19.4&#8243; _module_preset=&#8221;default&#8221; height=&#8221;50px&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_divider][et_pb_gallery gallery_ids=&#8221;21073,21072,21071,21074,19289,19290,19283,19286,19287,19288,19281,19293,19292,19291,19285,19284,19282,16532,16531,16537,16536,16529,16534,16530,16535,16533,15554,15553,15552,15551,15550,15549,15548,15555,15404,15410,15411,15412,15413,15414,15415,15416,15417,15409,15418,15419,15405,15403,15402,15401,15400,15399,15398,15397,15396,15395,15394,15393,15392,15391,15390,15389,15163,15162,15161,15160,14522,14523,13624,13625,13626,13627,13628,13629,13630,13075,13074,13076,13077,13078,13079,13080,13081,12712,12713,12717,12718,12716,12715,12714,12537,12538,12540,12539,12542,12541&#8243; posts_number=&#8221;3&#8243; admin_label=&#8221;Gallery Works&#8221; _builder_version=&#8221;4.23&#8243; global_colors_info=&#8221;{}&#8221;][\/et_pb_gallery][et_pb_text admin_label=&#8221;Text gallery Info Day 30-11-2023&#8243; _builder_version=&#8221;4.23&#8243; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h5>Info day for citizens in Vinkovci and a tour of the construction site in Vukovar &#8211; Borovo naselje with the media on November 30, 2023<\/h5>\n<p>[\/et_pb_text][et_pb_gallery gallery_ids=&#8221;21208,21207,21205,21206,21209,21211,21210&#8243; posts_number=&#8221;3&#8243; admin_label=&#8221;Gallery Info Day 30-11-2023&#8243; _builder_version=&#8221;4.23&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_gallery][et_pb_text admin_label=&#8221;Text gallery Info Day for the businessmen of Vukovar-Syrmia County, 22. i 23. 9. 2021.&#8221; _builder_version=&#8221;4.23&#8243; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h5>Info day for the businessmen of Vukovar-Syrmia County, September 22 and 23, 2021<\/h5>\n<p>[\/et_pb_text][et_pb_gallery gallery_ids=&#8221;15533,15534,15535,15536,15538,15537,15539,15543,15540,15544,15542,15541&#8243; posts_number=&#8221;3&#8243; admin_label=&#8221;Gallery&#8221; _builder_version=&#8221;4.16&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_gallery][\/et_pb_column][et_pb_column type=&#8221;1_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_image src=&#8221;https:\/\/eng.hzinfra.hr\/wp-content\/uploads\/2017\/11\/LOGO-EU-OPKK-200&#215;150.png&#8221; align=&#8221;center&#8221; align_tablet=&#8221;center&#8221; align_phone=&#8221;&#8221; align_last_edited=&#8221;on|desktop&#8221; admin_label=&#8221;Image EU Zajedno do fondova EU&#8221; _builder_version=&#8221;4.16&#8243; max_width=&#8221;200px&#8221; animation_style=&#8221;slide&#8221; animation_direction=&#8221;left&#8221; animation_duration=&#8221;500ms&#8221; animation_intensity_slide=&#8221;10%&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221; animation=&#8221;left&#8221; sticky=&#8221;off&#8221; always_center_on_mobile=&#8221;on&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<p>[\/et_pb_image][et_pb_divider show_divider=&#8221;off&#8221; disabled_on=&#8221;on|on|off&#8221; _builder_version=&#8221;4.16&#8243; height=&#8221;20px&#8221; hide_on_mobile=&#8221;on&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<p>[\/et_pb_divider][et_pb_image src=&#8221;https:\/\/eng.hzinfra.hr\/wp-content\/uploads\/2017\/11\/ESI-logotip_boja_manji.png&#8221; align=&#8221;center&#8221; align_tablet=&#8221;center&#8221; align_phone=&#8221;&#8221; align_last_edited=&#8221;on|desktop&#8221; admin_label=&#8221;Image ESI fondovi&#8221; _builder_version=&#8221;4.16&#8243; max_width=&#8221;200px&#8221; animation_style=&#8221;slide&#8221; animation_direction=&#8221;left&#8221; animation_duration=&#8221;500ms&#8221; animation_intensity_slide=&#8221;10%&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221; animation=&#8221;left&#8221; sticky=&#8221;off&#8221; always_center_on_mobile=&#8221;on&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<p>[\/et_pb_image][et_pb_divider show_divider=&#8221;off&#8221; disabled_on=&#8221;on|on|off&#8221; _builder_version=&#8221;4.16&#8243; height=&#8221;20px&#8221; hide_on_mobile=&#8221;on&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<p>[\/et_pb_divider][et_pb_image src=&#8221;https:\/\/eng.hzinfra.hr\/wp-content\/uploads\/2017\/11\/OPKK_boja_bez-pozadine_manji.png&#8221; align=&#8221;center&#8221; align_tablet=&#8221;center&#8221; align_phone=&#8221;&#8221; align_last_edited=&#8221;on|desktop&#8221; admin_label=&#8221;Image OPKK&#8221; _builder_version=&#8221;4.16&#8243; max_width=&#8221;200px&#8221; animation_style=&#8221;slide&#8221; animation_direction=&#8221;left&#8221; animation_duration=&#8221;500ms&#8221; animation_intensity_slide=&#8221;10%&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221; animation=&#8221;left&#8221; sticky=&#8221;off&#8221; always_center_on_mobile=&#8221;on&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<p>[\/et_pb_image][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Upgrade and electrification of line section Vinkovci &#8211; Vukovar Railway line Vinkovci &#8211; Vukovar (18.7 km) as a railway line for international traffic is part of the railway freight corridor RFC10 &#8220;Alps &#8211; Western Balkans&#8221;. On 21 May 2018 H\u017d Infrastruktura d.o.o. signed the Grant Agreement KK.07.5.1.05.0001 as part of the Operational Program &#8220;Competitiveness and [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"<p><img class=\"size-medium wp-image-9155 alignleft\" src=\"https:\/\/eng.hzinfra.hr\/wp-content\/uploads\/2018\/06\/VINKOVCI-VUKOVAR-300x180.png\" alt=\"\" width=\"300\" height=\"180\" \/>Upgrade and electrification of the railway line Vinkovci - Vukovar, a section important for international transport, in the length of <strong>18,71 kilometer<\/strong>, will enable an increase of the volume of the rail transport and transshipment operations in the <strong>Port of Vukovar<\/strong> and better connection of the rail passenger transport of the <strong>Vukovar-Srijem County<\/strong> with the <strong>main traffic corridors<\/strong> and other counties, and will have a particularly positive impact on the comfort and safety of the journeys as a part of the daily migrations of the passengers.<\/p><p>Following the modernization, the rail section Vinkovci \u2013 Vukovar will be adapted for the maximum train speed of <strong>120 km\/h<\/strong>, which will shorten the journey by ca. 50 percent, so the journey in passenger transport will take 20 minutes and in the freight transport 30 minutes. Electrification of the section will enable an economically and energetically more profitable, and an environmentally sustainable rail transport. The rail section capacity will be enhanced and the access to the Port of Vukovar will be improved. Being situated on the TEN-T Corridor Rheine-Danube, in this way the port will have a quality connection with the Corridor RH1, the former Paneuropean Corridor X. Modernization of the railway line Vinkovci - Vukovar will contribute to the economic development of the local community and recovery of the eastern part of Slavonia.<\/p><p>Project of upgrade and electrification of the railway line Vinkovci \u2013 Vukovar encompasses the following:<\/p><ul><li>Entire <strong>reconstruction and renewal<\/strong> of the <strong>existing single-track<\/strong> railway line<\/li><li><strong>Renewal<\/strong> of <strong>rail stations Vukovar-Borovo naselje<\/strong> and <strong>Vukovar<\/strong> and <strong>stops<\/strong> <strong>Nu\u0161tar <\/strong>and<strong> Br\u0161adin-Lipova\u010da<\/strong>,<\/li><li>Performance of all necessary <strong>works on the civil-engineering, control-command, signaling and interlocking and power subsystems<\/strong>.<\/li><\/ul><p>As a part of renewal of the rail stations and stops, the parking lots for personal cars and bicycles will be arranged, easier access to the persons with reduced mobility enabled, and for the sake of noise protection of the residents who live by the railway line, the noise barriers will be constructed. Installation of the up-to-date system of traffic signalization and telecommunications and construction of the pedestrian underpasses will enhance the safety of all participants in the traffic.<\/p><p><strong>The Grant Agreement<\/strong> for modernization of this rail section in the total value of <strong>HRK 677.701.939,19<\/strong> and eligible costs in the amount of <strong>HRK 516.330.736,35<\/strong> was signed on <strong>21 May 2018<\/strong> by the Ministry of Sea, Transport and Infrastructure, Central Finance and Contracting Agency, and H\u017d Infrastruktura. The Project is <strong>co-financed by the European Union<\/strong> from the Operational programme \u201cCompetitiveness and Cohesion\u201d, Cohesion fund with <strong>85 percent<\/strong> and by <strong>Government of the Republic of Croatia <\/strong>with<strong> 15 percent<\/strong>.<\/p><p>The works should start in the second half of 2018, after the procedures for public procurement for works and supervision have been completed, and putting of the modernized section in service is expected in late 2020.<\/p>","_et_gb_content_width":"","footnotes":""},"categories":[32],"tags":[],"class_list":["post-9154","post","type-post","status-publish","format-standard","hentry","category-eu-fondovi-2014-2020"],"_links":{"self":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/posts\/9154","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9154"}],"version-history":[{"count":0,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/posts\/9154\/revisions"}],"wp:attachment":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9154"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9154"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9154"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}