{"id":29924,"date":"2026-11-16T13:02:50","date_gmt":"2026-11-16T12:02:50","guid":{"rendered":"https:\/\/eng.hzinfra.hr\/?post_type=project&#038;p=29924"},"modified":"2026-11-16T13:02:54","modified_gmt":"2026-11-16T12:02:54","slug":"sesvete-dugo-selo-ivanic-grad","status":"publish","type":"project","link":"https:\/\/eng.hzinfra.hr\/?project=sesvete-dugo-selo-ivanic-grad","title":{"rendered":"SESVETE-DUGO SELO-IVANI\u0106-GRAD"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; theme_builder_area=&#8221;post_content&#8221; _builder_version=&#8221;4.27.9&#8243; _module_preset=&#8221;default&#8221;][et_pb_row _builder_version=&#8221;4.27.9&#8243; _module_preset=&#8221;default&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_column _builder_version=&#8221;4.27.9&#8243; _module_preset=&#8221;default&#8221; type=&#8221;4_4&#8243; theme_builder_area=&#8221;post_content&#8221;][et_pb_text _builder_version=&#8221;4.27.9&#8243; _module_preset=&#8221;default&#8221; theme_builder_area=&#8221;post_content&#8221; hover_enabled=&#8221;0&#8243; sticky_enabled=&#8221;0&#8243;]<\/p>\n<h3>SESVETE-DUGO SELO-IVANI\u0106-GRAD<\/h3>\n<p>Due to reconstruction and modernization works on the railway line Dugo Selo- Kri\u017eevci, <strong>from November 28<\/strong><strong>, 2026, at 11:30 pm until November 29<\/strong><strong>, <\/strong><strong>2026, at 5:10 am, <\/strong>special traffic regulation will be in effect and delays are expected.<\/p>\n<p>During this period, on the routes <strong>Sesvete-Kri\u017eevci and vice versa, <\/strong><strong>Dugo Selo-Ivani\u0107-Grad, Ivani\u0107-Grad-Sesvete, and Dugo Selo-Sesvete <\/strong>passengers will be transported by <strong>buses<\/strong> instead of trains:<\/p>\n<ul>\n<li><strong>2235<\/strong> Zagreb GK 1:48 am-<strong>Sesvete 2:08 am-Kri\u017eevci 2:59 am<\/strong><\/li>\n<li><strong>2230 Kri\u017eevci 3:23 am-Sesvete 4:13 am-<\/strong>Zagreb GK 4:31 am<\/li>\n<li><strong>2179 Dugo Selo 2:26 am-Ivani\u0107-Grad 2:48 am<\/strong><\/li>\n<li><strong>2170 Ivani\u0107-Grad 2:56-Sesvete 3:31 am-<\/strong>Zagreb GK 3:49 am<\/li>\n<li><strong>8002 Dugo Selo 4:51 am-Sesvete 5:40 am-<\/strong>Harmica 6:00 am.<\/li>\n<\/ul>\n<p>Due to the special traffic arrangements, delays are expected. We apologize to passengers for the delays, and kindly ask for their patience and understanding.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>SESVETE-DUGO SELO-IVANI\u0106-GRAD Due to reconstruction and modernization works on the railway line Dugo Selo- Kri\u017eevci, from November 28, 2026, at 11:30 pm until November 29, 2026, at 5:10 am, special traffic regulation will be in effect and delays are expected. During this period, on the routes Sesvete-Kri\u017eevci and vice versa, Dugo Selo-Ivani\u0107-Grad, Ivani\u0107-Grad-Sesvete, and Dugo [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[114],"project_tag":[],"class_list":["post-29924","project","type-project","status-publish","hentry","project_category-works-on-the-network"],"_links":{"self":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/project\/29924","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/project"}],"about":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=29924"}],"version-history":[{"count":2,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/project\/29924\/revisions"}],"predecessor-version":[{"id":29927,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=\/wp\/v2\/project\/29924\/revisions\/29927"}],"wp:attachment":[{"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=29924"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fproject_category&post=29924"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/eng.hzinfra.hr\/index.php?rest_route=%2Fwp%2Fv2%2Fproject_tag&post=29924"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}