Preparation of the design and other project documentation necessary for the reconstruction and modernisation of Dugo Selo – Novska railway line, phase 1

 

0HZ_0451 - 5MBThe aim of the project is to prepare the design and other project documentation necessary for the reconstruction and modernisation of the Dugo Selo – Novska railway line in the scope of phase 1. The line is part of the corridor RH1, of the croatian part of the X Pan-European corridor. The total value of the works is  5.4 million, of which 85% is provided by the European Union (IPA – Instrument for Pre-Accession Assistance – € 4,591,733) and 15% by the Croatian Government. The deadline for the completion of the design is 36 months after the signing of the contract.

The contract on the design for the works on the existing track and the grade separation of the existing level crossings was signed on 16th June 2011 by HŽ Infrastruktura d.o.o. as the contracting authority and DB International GmbH of Germany in a consortium with Željezničko projektno društvo d.d. and Granova d.o.o. of Croatia as the contractor.

The following documentation will be drawn up in the scope of the contract:

  • preliminary design with accompanying studies and surveys for the reconstruction and modernisation of the Dugo Selo – Novska section, phase 1, with the issuance of location permits
  • main design with accompanying surveys for the reconstruction and modernisation of the Dugo Selo – Novska section, phase 1 on subsection Dugo Selo – Novoselec, with the issuance of necessary building permit,
  • feasibility study with a cost benefit analysis and a financial and economic analysis,
  • an environmental impact study,
  • a draft of the application to the EU structural fund for co-financing works,
  • a draft tender dossiers for the reconstruction and modernisation of the Dugo Selo – Novska section, phase 1.

For further information, please contact: korporativne.komunikacije@hzinfra.hr