Considering the fact that almost 55 per cent of the railway network in the Republic of Croatia relates to railway lines significant for international traffic, within the scope of Croatian railway network modernization, HŽ Infrastruktura emphasizes projects, for which co-financing has been foreseen largely from EU funds, i.e. those projects for which HŽ Infrastruktura has already secured European funding, as well as all other projects that can be realized by co-financing from EU funds.
ONGOING PROJECTS
- Dugo Selo – Križevci Railway Section Upgrade and Construction of Second Track
- Modernization and electrification of the Zaprešić – Zabok railway line
- Upgrade and electrification of the railway line Vinkovci – Vukovar
- Preparation for construction of second track, upgrade and modernisation on railway line section Škrljevo – Rijeka – Jurdani
- Reconstruction of the existing track and construction of the second track on the section Križevci-Koprivnica-state border
- Upgrade of the Rijeka Port infrastructure – Zagreb Pier container terminal (POR2CORE-ZCT)
- Preparation of projects and other project documentation for the second track upgrade, rehabilitation and construction and construction of the new double track railway line Dugo Selo – Novska, Phases 2 and 3
- Reconstruction of the existing and construction of the second track on the section Hrvatski Leskovac – Karlovac on the railway line M202 Zagreb GK – Rijeka
- Preparation of technical documentation for the modernization of Oštarije – Škrljevo rail section
- Preparation of design documentation for the reconstruction of the Okučani – Vinkovci railway line
- Preparation of study and design documents for the modernization of Karlovac – Oštarije railway section
- Improvement of railway infrastructure – establishment of monitoring systems for safety, security and technical controls
- Project of protection and modernization of level crossings
- Application of telematics applications for European interoperability
- Studies to upgrade the railway line section Zagreb Main Station – Hrvatski Leskovac
- Preparation of a Study for Zagreb Railway Node Development
COMPLETED PROJECTS
- Preparation of the project and other design documentation for the reconstruction and construction of the second track line on the Hrvatski Leskovac – Karlovac Section
- Connecting via rail within the funcional region of Central Croatia – Lepoglava junction
- Port of Rijeka multimodal platform development and interconnection to Adriatic Gate container terminal (POR2CORE-AGCT) – Reconstruction of the railway station Rijeka Brajdica and container terminal Brajdica
- Construction of a New Railway Line for Suburban Traffic on Section Gradec – Sveti Ivan Žabno
- Preparation of design and other project documents for upgrade and construction of second track on railway line section Križevci – Koprivnica – National Border
- Preparation of the design and other project documentation necessary for the reconstruction and modernisation of Dugo Selo – Novska railway line, phase 1
- Vinkovci to Tovarnik to State Border Railway Rehabilitation
- Modernization of the Zagreb Main Railway Station Signalling and Interlocking System
- Preparation of design and other project documents for “Upgrade and Electrification of Railway Line Vinkovci – Vukovar“
- Okučani to Novska Railway Rehabilitation and Upgrade
- Preparation of a Study on the Zagreb Rail Node Development
- Preparation of the Study for the Introduction of the European Traffic Management System (ERTMS)
- Assisstance to HŽ Infrastruktura in the Evaluation of Bids for Works
- Technical assistance to improve capacity building for Railway Infrastructure Manager in Croatia
- Strengthening the cooperation between railway infrastructure managers for better safety management