Preparation of design and other project documents for upgrade and construction of second track on railway line section Križevci – Koprivnica – National Border

karta Krizevci-Koprivnica-DG

The contract for the Preparation of design and other project documents for upgrade and construction of second track on railway line section Križevci – Koprivnica – National Border was signed on 10th December 2012 by HŽ Infrastruktura d.o.o. as Contracting Authority and URS Polska Sp. z.o.o., in consortium with URS Infrastructure and Environment UK Limited and IDOM Ingenieria y Consultoria S.A., as the Consultant. In the meantime, during the implementation of the contract, URS Polska Sp. z o.o and URS Infrastructure and Environment UK Limited changed their names to AECOM Polska Sp. z.o.o. and AECOM Infrastructure and Environment UK Limited, respectively.

The total value of the design contract is € 5.3 million, of which 85% is provided by the European Union (IPA) and 15% by the Croatian Government. The deadline for the completion of the design is 42 months from the contract signature date.

The following documentation was prepared in the scope of the contract:

  • preliminary design with pertaining studies and reports for the reconstruction of the existing tracks and the construction of the second track on the railway line section Križevci – Koprivnica – National Border with the issuance of location permits
  • main design with pertaining studies for the reconstruction of the existing track and the construction of the second track on the railway line section Križevci – Koprivnica – National Border with the issuance of the necessary building permits
  • feasibility study with a cost-benefit analysis and a financial and economic analysis, an environmental impact study, a draft of the application for EU co-financing of construction, as well as draft tender dossiers.