Reconstruction and Construction of the Second Track on the Railway Line Section Dugo Selo – Križevci
- Works contract in the amount of HRK 1.239.557.818, 93 (VAT excluded), was signed on April 29, 2016 with a consortium of DIV d.o.o. Samobor, DALEKOVOD d.o.o. Zagreb and Zagreb-montaža d.o.o. Zagreb.
– Publication can be accessed here.
- Works supervision contract in the amount of HRK 14.425.088,61 (VAT excluded), was signed on April, 29, 2016 with a consortium of Investinženjering d.o.o. Zagreb and SGS Adriatica d.o.o. Zagreb.
– Publication can be accessed here.